Construction & regeneration
24 Nov 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - November 2019
Bank Tower Two is complete with just the fitout of the ground level retail spaces to go. A dull misty day for these photos but some interesting perspectives and angles.
The Construction of Bank Tower Two - November 2019
Bank Tower Two is complete with just the fitout of the ground level retail spaces to go. A dull misty day for these photos but some interesting perspectives and angles.
Construction & regeneration
25 Oct 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - October 2019
Most of the external lifts have been removed from Bank Tower Two now that the cladding is complete. Lower retail sections are now being prepared for fit out.
Open the post for some stunning photography from Daniel.
Most of the external lifts have been removed from Bank Tower Two now that the cladding is complete. Lower retail sections are now being prepared for fit out.
Open the post for some stunning photography from Daniel.
Construction & regeneration
11 Oct 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - September/October 2019
Here's a gallery of photos from September and October so far of the construction of Bank Birmingham Tower Two, with lots of different lighting conditions.
The Construction of Bank Tower Two - September/October 2019
Here's a gallery of photos from September and October so far of the construction of Bank Birmingham Tower Two, with lots of different lighting conditions.
Construction & regeneration
29 Aug 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - August 2019
The new strip lights on the top of Bank Tower Two were shining a lovely turquoise for a couple of days. Here are some more shots as well as some of the tower reflecting the sunset and a coulple taken from Digbeth.
The new strip lights on the top of Bank Tower Two were shining a lovely turquoise for a couple of days. Here are some more shots as well as some of the tower reflecting the sunset and a coulple taken from Digbeth.
Construction & regeneration
12 Jul 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - July 2019
Bank Tower Two is very close to fully clad now with the external lifts on the west side removed. Great colours in the sunlight contrasting with Tower One's more bronze and gold exterior.
Bank Tower Two is very close to fully clad now with the external lifts on the west side removed. Great colours in the sunlight contrasting with Tower One's more bronze and gold exterior.
Construction & regeneration
25 Jun 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - June 2019
Bank Tower Two is nearing external completion with most of the cladding now installed, construction update photos in this post and some from the 'Sky High Birmingham' visit to the top at the invitation of Wates Group.
Bank Tower Two is nearing external completion with most of the cladding now installed, construction update photos in this post and some from the 'Sky High Birmingham' visit to the top at the invitation of Wates Group.
Construction & regeneration
06 Jun 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - June 2019
Some of the cladding has been installed to the top and is starting to show how the tower will reflect the sunlight, the top two floors having more stripes than the rest and are larger, higher floors.
Some of the cladding has been installed to the top and is starting to show how the tower will reflect the sunlight, the top two floors having more stripes than the rest and are larger, higher floors.
Construction & regeneration
04 Jun 2019 - Stephen Giles
Gallery
An illuminated crown to light up the City skyline in Birmingham!
With the cladding inching closer to completion, Stephen Giles looks at the distinctive two-storey crown feature that'll top off this momentous development.
An illuminated crown to light up the City skyline in Birmingham!
With the cladding inching closer to completion, Stephen Giles looks at the distinctive two-storey crown feature that'll top off this momentous development.
The silver cladding continues its upward rise, and with the interior meticulously being fitted out, attention is quickly turning to the distinctive two-storey crown feature at the very top.
Excitingly, it will incorporate a new addition to the city’s skyline – an illuminated crown.
It came about after Regal Property Group, the developer, saw an opportunity to enhance the project by adding an extra two storeys, taking it from 31 to 33 floors.
Not only did this see the building whiz past the 100 metre mark (102m), but it allowed the architects to produce a design that gave the project further distinction, given that it will sit proudly on the skyline for years to come.
Glancy Nicholls have designed this to acknowledge the silverworks metal working heritage of Broad Street from yesteryear. The tower already takes subtle nods from that, referencing it with its silver hues in its design and materiality.
dndimg alt="" dndsrc="../uploadedfiles/Artist Impressions of Bank Tower II.png" style="width: 100%;" />Artist Impressions by Glancy Nicholls Architects
The crown has seen an increase in silver frame bars/spindles, with strips of vertical blue lighting, which will further define the crown and give Bank II an imposing identity.
Once complete, the building will boast recessed LED lighting, and given the site location, on what is one of the tallest plots of land in the city, it'll be instantly recognisable for miles around.
dndimg alt="" dndsrc="../uploadedfiles/Artist Impressions of Bank Tower II.jpg" style="width: 100%;" />
dndimg alt="" dndsrc="../uploadedfiles/Artist Impressions of Bank Tower II (2).jpg" style="width: 100%;" />Artist impressions by Glancy Nicholls Architects
June 1st construction update:
dndimg alt="" dndsrc="../uploadedfiles/The Construction of Bank Tower II - June 1st 2019.jpg" style="width: 100%;" />Picture by Aqueembayor
dndimg alt="" dndsrc="../uploadedfiles/Construction of Bank Tower II - June 1st 2019 (5).jpg" style="width: 100%;" />
dndimg alt="" dndsrc="../uploadedfiles/Construction of Bank Tower II - June 1st 2019 (4).jpg" style="width: 100%;" />
dndimg alt="" dndsrc="../uploadedfiles/Construction of Bank Tower II - June 1st 2019 (1).jpg" style="width: 100%;" />
dndimg alt="" dndsrc="../uploadedfiles/Construction of Bank Tower II - June 1st 2019 (3).jpg" style="width: 100%;" />
Construction & regeneration
19 May 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - May 2019
The cladding is approaching completion and is really starting to catch the light, many more photos from various perspectives in this gallery, including from our recent trip to the top of the Rotunda thanks to Staying Cool.
The cladding is approaching completion and is really starting to catch the light, many more photos from various perspectives in this gallery, including from our recent trip to the top of the Rotunda thanks to Staying Cool.
Construction & regeneration
07 Apr 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - April 2019
There has been much more cladding installed and a lot has been revealled showing the striking grey/bronze colours. Lots of photos in this construction update.
There has been much more cladding installed and a lot has been revealled showing the striking grey/bronze colours. Lots of photos in this construction update.
Construction & regeneration
30 Mar 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - March 2019
The focus of construction at Bank Birmingham is now on the cladding of Tower Two as the crane is now removed, lots more is revealed and the windows on one corner are installed to the top.
The focus of construction at Bank Birmingham is now on the cladding of Tower Two as the crane is now removed, lots more is revealed and the windows on one corner are installed to the top.
Construction & regeneration
09 Mar 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - March 2019
Leftbank Tower Two is dominating the westside and can be seen from lots of areas and angles, here from the Mailbox. The external lifts have been extended to the top for the rest of the cladding to be installed.
Leftbank Tower Two is dominating the westside and can be seen from lots of areas and angles, here from the Mailbox. The external lifts have been extended to the top for the rest of the cladding to be installed.
Construction & regeneration
25 Feb 2019 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - February 2019
The final piece of slip-form has been removed from the top of the structurally complete Leftbank Tower Two and the cladding is chasing up fast, the tower is really showing how it will catch the sunlight now.
The Construction of Bank Tower Two - February 2019
The final piece of slip-form has been removed from the top of the structurally complete Leftbank Tower Two and the cladding is chasing up fast, the tower is really showing how it will catch the sunlight now.
Wow! What a view across Birmingham (and then some) from the top of Bank Tower Two
Daniel Sturley, a Birmingham community photographer and one of the City's incredibly talented and inspired 'People with Passion', was invited by Wates to the topping out ceremony at Bank Tower Two in Birmingham to take some skyline photography.
Just take a look at the view from up there! What a brilliant gallery of photography!
Wow! What a view across Birmingham (and then some) from the top of Bank Tower Two
Daniel Sturley, a Birmingham community photographer and one of the City's incredibly talented and inspired 'People with Passion', was invited by Wates to the topping out ceremony at Bank Tower Two in Birmingham to take some skyline photography.
Just take a look at the view from up there! What a brilliant gallery of photography!
Construction & regeneration
26 Dec 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two - December 2018
Wates Group's Bank Tower Two is now completing the final floor, the top two stories being higher floors that are now clearly visible. Many photos in this update covering 16th and 22nd December.
The Construction of Bank Tower Two - December 2018
Wates Group's Bank Tower Two is now completing the final floor, the top two stories being higher floors that are now clearly visible. Many photos in this update covering 16th and 22nd December.
Construction & regeneration
22 Nov 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The main structure of Bank Tower Two on Broad Street is just a floor short of topping out, it looks great on the skyline at the moment all lit up with temporary lighting. A big gallery of photos in this update.
The main structure of Bank Tower Two on Broad Street is just a floor short of topping out, it looks great on the skyline at the moment all lit up with temporary lighting. A big gallery of photos in this update.
Construction & regeneration
29 Oct 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.
Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.
Construction & regeneration
21 Oct 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.
The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.
Construction & regeneration
07 Oct 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
It looks like another big chunk of cladding is ready to be revealed and the main structure is nearing the last few floors. Lots of photos in this update, view them in the full post.
It looks like another big chunk of cladding is ready to be revealed and the main structure is nearing the last few floors. Lots of photos in this update, view them in the full post.
Construction & regeneration
27 Aug 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
As Bank Tower Two continues to fly up the focus in this update is on the cladding as it goes on around the lower floors, now really showing how it will catch the light.
As Bank Tower Two continues to fly up the focus in this update is on the cladding as it goes on around the lower floors, now really showing how it will catch the light.
Construction & regeneration
20 Aug 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two is up to the 23rd floor with its main structure and there are several large areas at the base of the tower now fully clad, can't wait to see some photos of this in the sunshine. Lots of photos in this update.
Bank Tower Two is up to the 23rd floor with its main structure and there are several large areas at the base of the tower now fully clad, can't wait to see some photos of this in the sunshine. Lots of photos in this update.
Construction & regeneration
05 Aug 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two has powered past it's older sibling now at the 23rd floor and the final cladding is ready to install on the lower floors. 14 photos in this update for the end of July and the start of August.
Bank Tower Two has powered past it's older sibling now at the 23rd floor and the final cladding is ready to install on the lower floors. 14 photos in this update for the end of July and the start of August.
Construction & regeneration
18 Jul 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Another great sunny day for this update, the main structure is at the 21st floor and the lower floors are ready for the final cladding panels to be revealed.
Another great sunny day for this update, the main structure is at the 21st floor and the lower floors are ready for the final cladding panels to be revealed.
Construction & regeneration
13 Jul 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two's main structure is almost up to it's sibling Tower One and the cladding on the lower floors are almost ready for the final layer. A beautiful sunny day for the main photos in this update.
Bank Tower Two's main structure is almost up to it's sibling Tower One and the cladding on the lower floors are almost ready for the final layer. A beautiful sunny day for the main photos in this update.
Construction & regeneration
13 Jul 2018 - Daniel Sturley
Inspiration
Bank Tower Two on the Birmingham City Skyline from Clent Hills
This shot is from Clent Hills on the 7th July 2018. The Birmingham skline is constantly changing, in this shot we can see how Bank Tower Two on Broad Street will dominate the central cluster from a western viewpoint. More in BT2's update shortly.
Construction & regeneration
10 Jun 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two continues to rise with seemingly increasing pace now. A few from different perspectives for this update, here from the Library of Birmingham, some from Five Ways Park.
Bank Tower Two continues to rise with seemingly increasing pace now. A few from different perspectives for this update, here from the Library of Birmingham, some from Five Ways Park.
Construction & regeneration
05 Jun 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two on Broad Street in Birmingham is becoming the dominant feature in the westside with the main structure up to the 16th floor and many more windows on the lower floors.
Bank Tower Two on Broad Street in Birmingham is becoming the dominant feature in the westside with the main structure up to the 16th floor and many more windows on the lower floors.
Construction & regeneration
03 Jun 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
A week late on this photo update but well worth a look, there has been much more sub-cladding and window installation on the lower floors and signs of the street level areas being prepared for retail and food outlets. Photos from 26th May.
A week late on this photo update but well worth a look, there has been much more sub-cladding and window installation on the lower floors and signs of the street level areas being prepared for retail and food outlets. Photos from 26th May.
Construction & regeneration
09 May 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The core has gone up to the 33rd floor and the main structure continues to rise at Bank Tower Two, it was a sunny day for the main photos in this update.
The core has gone up to the 33rd floor and the main structure continues to rise at Bank Tower Two, it was a sunny day for the main photos in this update.
Construction & regeneration
29 Apr 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The concrete core for Bank Tower Two has reached the final floor at 32, but the main structure is starting to power up now with lots of cladding frames and insulation being installed on the lower ten floors and even a few windows going in. Click 'View full post' to see the gallery of photos from this weekend.
The concrete core for Bank Tower Two has reached the final floor at 32, but the main structure is starting to power up now with lots of cladding frames and insulation being installed on the lower ten floors and even a few windows going in. Click 'View full post' to see the gallery of photos from this weekend.
Construction & regeneration
28 Apr 2018 - Daniel Sturley
News & Updates
The Construction of Bank Tower Two
The core for Bank Tower Two has reached it's full height at the 32nd floor, here seen reflected in the windows of the Library of Birmingham's 'Secret Garden'.
Here are three photos taken with three different lenses of the construction of Bank Tower Two on Broad Street as part of the Left Bank development. Click 'View Article' to see the photos, descriptions and tips.
Here are three photos taken with three different lenses of the construction of Bank Tower Two on Broad Street as part of the Left Bank development. Click 'View Article' to see the photos, descriptions and tips.
These were taken just before sunset, using a Canon 60D hand held with ISO 400 film speed.
28-80mm zoom lens at 80mm, 1/200th second exposure, F/8
I always like to fire off several captures because I find that a tiny camera shake can defocus the image and I can never tell properly till I see it on my laptop.
70-300mm zoom lens at 228mm, 1/1000th second exposure, F/5.6.
I definitely needed to fire off a few to make sure that I got this sharp (it's pin sharp on the 18mpx master too). The lens produces a sever magenta flare in the shadows adjacent to super reflective edges, most consumer lens have this effect due to the minute tint in the lens glass and can often be red to even green. I removed most of it in Photoshop Elements by reducing the saturation on only the magenta channel and if did not really effect the rest of the photo. It can still be seen but is much better.
Construction & regeneration
29 Mar 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The core for Bank Tower Two has been stalled at the 29th floor because of high winds but the main structure is progressing fast. Click 'View Article' to see some recent photos.
The core for Bank Tower Two has been stalled at the 29th floor because of high winds but the main structure is progressing fast. Click 'View Article' to see some recent photos.
Construction & regeneration
18 Mar 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The core for Bank Tower Two has stalled at the 29th floor due to high winds and adverse weather but the main structure is continuing, now up to the 10th floor. Click 'View Article' to see the rest of the photos.
The core for Bank Tower Two has stalled at the 29th floor due to high winds and adverse weather but the main structure is continuing, now up to the 10th floor. Click 'View Article' to see the rest of the photos.
Construction & regeneration
04 Mar 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
A freezing and foggy day in the aftermath of the 'Beast from the East' and Storm Emma was the backdrop for this construction update of Bank Tower Two at the Left Bank development on Broad Street in Birmingham. The photos still help to give an impression of the looming bulk of the tower as it rises to the eighth floor with the core at 30. Click 'View Article' to see the rest of the photos.
A freezing and foggy day in the aftermath of the 'Beast from the East' and Storm Emma was the backdrop for this construction update of Bank Tower Two at the Left Bank development on Broad Street in Birmingham. The photos still help to give an impression of the looming bulk of the tower as it rises to the eighth floor with the core at 30. Click 'View Article' to see the rest of the photos.
Construction & regeneration
26 Feb 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two continues to rise, here is a gallery of photos from the weekend, including a few taken from a distance showing the effect it is having on the skyline. Click 'View Article' to see the rest.
Bank Tower Two continues to rise, here is a gallery of photos from the weekend, including a few taken from a distance showing the effect it is having on the skyline. Click 'View Article' to see the rest.
Construction & regeneration
24 Feb 2018 - Daniel Sturley
News & Updates
The Construction of Bank Tower Two
The core for Bank Tower Two is at the 29th floor and the main structure up to the 7th, now taller than the Bank building on the Broad Street side of the site. More photos of the progress to follow soon.
Construction & regeneration
17 Feb 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The concrete core for Bank Tower Two is up to the 28th of 33 floors but the main structure is starting to show big progress from street level, the tower will seem massive from Broad Street once it gets up to more than ten floors. Click 'View Article' to see the gallery of photos.
The concrete core for Bank Tower Two is up to the 28th of 33 floors but the main structure is starting to show big progress from street level, the tower will seem massive from Broad Street once it gets up to more than ten floors. Click 'View Article' to see the gallery of photos.
Construction & regeneration
10 Feb 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The progress moves so fast at Left Bank with Tower Two's core up to the 27th floor and the main structure moving on to the sixth. Here seen from the Library of Birmingham. Click 'View Article' to see the gallery of photos from this weekend.
The progress moves so fast at Left Bank with Tower Two's core up to the 27th floor and the main structure moving on to the sixth. Here seen from the Library of Birmingham. Click 'View Article' to see the gallery of photos from this weekend.
Construction & regeneration
04 Feb 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Here's a photo update of the progress at Bank Tower Two on Broad Street which has the core up to the 26th floor and the main structure of the lower few floors complete. Click 'View Article' to see the gallery of photos.
Here's a photo update of the progress at Bank Tower Two on Broad Street which has the core up to the 26th floor and the main structure of the lower few floors complete. Click 'View Article' to see the gallery of photos.
Construction & regeneration
27 Jan 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The core of Bank Tower Two is now well past Tower One at the 25th floor and is starting to dominate the westside from many angles. Click 'View Article' to see a gallery of recent photos.
The core of Bank Tower Two is now well past Tower One at the 25th floor and is starting to dominate the westside from many angles. Click 'View Article' to see a gallery of recent photos.
Construction & regeneration
14 Jan 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The core for Bank Tower Two powers past it's shorter sibling and becomes visible from loads of vantage points around the city. Click 'View Article' to view a gallery of photos from this massive build.
The core for Bank Tower Two powers past it's shorter sibling and becomes visible from loads of vantage points around the city. Click 'View Article' to view a gallery of photos from this massive build.
Construction & regeneration
07 Jan 2018 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The concrete core for Bank Tower Two is up to the 18th floor, soon to be level with Tower One. The main structure is progressing well with the lower floors well into construction. Click 'View Article' to see some more photos.
The concrete core for Bank Tower Two is up to the 18th floor, soon to be level with Tower One. The main structure is progressing well with the lower floors well into construction. Click 'View Article' to see some more photos.
Construction & regeneration
05 Jan 2018 - Daniel Sturley
News & Updates
The Westside City Skyline Changes Again
The westside city skyline welcomes the concrete core for Bank Tower Two, about half way up now and soon to rise above Tower One, here seen at night looking over Brindleyplace towards Edgbaston.
Construction & regeneration
23 Dec 2017 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two is rising strikingly fast with the core already about half way up and the the main structure on to the 4th floor. Click 'View Article' to see some recent photos.
Bank Tower Two is rising strikingly fast with the core already about half way up and the the main structure on to the 4th floor. Click 'View Article' to see some recent photos.
Construction & regeneration
23 Dec 2017 - Daniel Sturley
News & Updates
Bank Tower Two Hits the City Skyline
Seen here from the 'Secret Garden' atop the Library of Birmingham, the core for Bank Tower Two is about half way up and will soon rise above Tower One. More recent photos to come.
Construction & regeneration
10 Dec 2017 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
The core for Bank Tower Two is up to the 11th floor and the main structure is chasing behind, moving really quickly this construction, it will soon be on the skyline. Click 'View Article' to see some more photos.
The core for Bank Tower Two is up to the 11th floor and the main structure is chasing behind, moving really quickly this construction, it will soon be on the skyline. Click 'View Article' to see some more photos.
Construction & regeneration
11 Nov 2017 - Daniel Sturley
News & Updates
The Construction of Bank Tower Two
With Bank Tower One now structurally complete the focus shifts to Tower Two with the core rising fast and the lower floors already under construction. Click 'View Article' to see some more photos.
With Bank Tower One now structurally complete the focus shifts to Tower Two with the core rising fast and the lower floors already under construction. Click 'View Article' to see some more photos.
Construction & regeneration
04 Nov 2017 - Daniel Sturley
News & Updates
Bank Tower Two Crane Installation
The rest of the crane for the construction of Bank Tower Two on Broad Street is being installed this weekend. Click 'View Article' to see more photos from today.
The rest of the crane for the construction of Bank Tower Two on Broad Street is being installed this weekend. Click 'View Article' to see more photos from today.
Construction & regeneration
28 Oct 2017 - Daniel Sturley
Gallery
The Construction of Bank Tower Two
Bank Tower Two starts to rise and will quickly speed up now that the lower structure is well on the way. It is becoming clearer why there are no windows on the side of Tower One adjacent to Tower Two, they will be very close at this corner! Click 'View Article' to see some more photos.
Bank Tower Two starts to rise and will quickly speed up now that the lower structure is well on the way. It is becoming clearer why there are no windows on the side of Tower One adjacent to Tower Two, they will be very close at this corner! Click 'View Article' to see some more photos.
Construction & regeneration
23 Oct 2017 - Daniel Sturley
News & Updates
Bank Tower One Almost Complete
Bank Tower One is almost externally complete with the last few floors of cladding going on, seen here from Broad Street near the Hyatt Hotel where it really dominates, untill Tower Two goes up that is!
Construction & regeneration
12 Oct 2017 - Daniel Sturley
News & Updates
The Construction of Bank Tower One
Bank Tower One is starting to look dazzling in the low autumn sun, the cladding is moving onto the final floors and the part-installed crane for Tower Two has been tethered to the top. Click 'View Article' below to see some more photos.
Bank Tower One is starting to look dazzling in the low autumn sun, the cladding is moving onto the final floors and the part-installed crane for Tower Two has been tethered to the top. Click 'View Article' below to see some more photos.
Construction & regeneration
08 Oct 2017 - Daniel Sturley
News & Updates
The Construction of Bank Tower Two
With Bank Tower One nearly fully clad a crane is being installed for the constuction of Bank Tower Two. Click 'View Article' below to see some more photos of Tower One.
With Bank Tower One nearly fully clad a crane is being installed for the constuction of Bank Tower Two. Click 'View Article' below to see some more photos of Tower One.
Construction & regeneration
07 Oct 2017 - Daniel Sturley
News & Updates
The Construction of Bank Tower One
Bank Tower One reflected in the black windows of the Novotel opposite, the amazing gold and bronze cladding is nearing completion. Click 'View Article' below to see some more photos from this build.
Bank Tower One reflected in the black windows of the Novotel opposite, the amazing gold and bronze cladding is nearing completion. Click 'View Article' below to see some more photos from this build.
Construction & regeneration
24 Sep 2017 - Daniel Sturley
News & Updates
The Construction of Bank Tower One
Bank Tower One at the Left Bank development is over three quarters clad now and is showing its stricking colours. Click 'View Article' below to see some more photos.
Bank Tower One at the Left Bank development is over three quarters clad now and is showing its stricking colours. Click 'View Article' below to see some more photos.
Construction & regeneration
16 Sep 2017 - Daniel Sturley
News & Updates
Progress at Bank Tower One
Bank Tower One is well on the way to being fully clad and is starting to show the vertical emphasis of the design as well as the colouring. Click 'view article' below to see four more photos.
Bank Tower One is well on the way to being fully clad and is starting to show the vertical emphasis of the design as well as the colouring. Click 'view article' below to see four more photos.
Click 'article' below to view a set of recent construction photos of Wates Group's Bank Tower One at the Leftbank site on Broad street, and a few from Daniel's visit to the roof in July from his archive.
Click 'article' below to view a set of recent construction photos of Wates Group's Bank Tower One at the Leftbank site on Broad street, and a few from Daniel's visit to the roof in July from his archive.