One Chamberlain Square
Birmingham
B3 3HQ
View site map HERE
Photography by Daniel Sturley.
Architect: Eric Parry Architects
Construction: BAM
Developer: Argent
In brief
One Chamberlain Square has been the first of the modern buildings to open as part of Argent's huge and transformative Paradise development in the centre of Birmingham.
One Chamberlain Square. Photography by Daniel Sturley.
The building was designed by Eric Parry Architects and built by BAM.
One Chamberlain Square is home to international professional services firm pwc.
Dishoom Birmingham occupies 11,000 sq.ft of restaurant/bar space on the ground floor of One Chamberlain Square.
Photography by Peter Manchester
Story of the build
August 2016
Construction of One Chamberlain Square commences.
Photography by Daniel Sturley.
October 2016
Foundation piling and a big hole to start the core.
Photography by Daniel Sturley.
November 2016
Steel for the foundation piles arrives.
Photography by Daniel Sturley.
December 2016
Lots of lower steel structure started.
Photography by Daniel Sturley.
February 2017
The building's foot print starts to show its shape.
Photography by Daniel Sturley.
March 2017
Street level floor construction starts.
Photography by Daniel Sturley.
April 2017
Demolition continues around the rising building at Paradise Birmingham.
Photography by Daniel Sturley.
May 2017
The rear of the building as the structure starts to rise above street level.
Photography by Daniel Sturley.
June 2017
The building rises above the hordings from Centenary Way.
Photography by Daniel Sturley.
July 2017
The Paradise Birmingham Big Sleuth Bear makes an appearance.
Photography by Daniel Sturley.
August 2017
The curvy shap of the build starts to become apparent.
Photography by Daniel Sturley.
September 2017
One Chamberlain Square under construction from the Library of Birmingham's 'Secret Garden'.
Photography by Daniel Sturley.
October 2017
The curves from Great Charles Street.
Photography by Daniel Sturley.
November 2017
The first sign of windows at One Chamberlain Square.
Photography by Daniel Sturley.
December 2017
Windows wrap the lower floors at One Chamberlain Square as the main structure nears completion.
Photography by Daniel Sturley.
January 2018
From Great Charles Street.
Photography by Daniel Sturley.
February 2018
The roof parapet structure is installed.
Photography by Daniel Sturley.
March 2018
Demolition of the southside of the Paradise Birmingham site continues.
Photography by Daniel Sturley.
April 2018
Windows on the lower structure are now almost complete.
Photography by Daniel Sturley.
May 2018
Installation of the vertical terracotta stripes commences.
Photography by Daniel Sturley.
June 2018
Many more stripes are now added all round the building.
Photography by Daniel Sturley.
June 2018
The building seen from Paradise street as the lower structure of Two Chamberlain Square sarts to rise.
Photography by Daniel Sturley.
July 2018
A lot of the vertical terracotta stripes are installed.
Photography by Daniel Sturley.
August 2018
Two Chamberlain Square rises along side as more foors are added.
Photography by Daniel Sturley.
September 2018
The first opportunity to see some architectural detail of the finished cladding.
Photography by Daniel Sturley.
October 2018
The building looking almost externally complete from Victoria Square.
Photography by Daniel Sturley.
November 2018
Two Chamberlain Square rises to level with its sibling.
Photography by Daniel Sturley.
December 2018
Finishing touches are made to the exterior of One Chamberlain Square.
Photography by Daniel Sturley.
January 2019
Two Chamberlain Square hints at the look an feel of the new Chamberlain Square.
Photography by Daniel Sturley.
February 2019
One Chamberlain Square is close to external completion.
Photography by Daniel Sturley.
March 2019
The externally finished building as seen from Centenary Square.
Photography by Daniel Sturley.
April 2019
One Chamberlain Square with the Clock Tower of the Museum and Art Gallery ('Big Brum')
Photography by Daniel Sturley.
May 2019
One Chamberlain Square with some 'Beaky Blinders' in Centenary Square.
Photography by Daniel Sturley.
June 2019
One and Two Chamberlain Square as seen from the Library of Birmingham's Lower Terrace.
Photography by Daniel Sturley.
July 2019
One Chamberlain Square offers some great opprtunities for reflection photos.
Photography by Daniel Sturley.
August 2019
One and Two Chamberlain Square as seen from the Hyatt Regency Hotel.
Internal fit out of One Chamberlain Square commences. For more, see article at http://BirminghamWeAre.net/post/1891
Photography by Daniel Sturley.
September 2019
The externall complete One Chamberlain Square with Baskerville House.
Photography by Daniel Sturley.
October 2019
One and Two Chamberlain Square with the massive concrete core for 103 Colmore Row behind.
Photography by Daniel Sturley.
November 2019
The canyon of Centenary Way with One and Twoo Chamberlain Square externally completed.
Photography by Daniel Sturley.
December 2019
Opening of One Chamberlain Square by pwc - For more, see article at http://BirminghamWeAre.net/post/2029
Photography by Daniel Sturley.
See the full construction gallery of hundreds of photos covering the whole build here: FULL GALLERY